St Marys Water Recycling Plant
All Case Studies
Water Industry St Marys, NSW

St Marys Water Recycling Plant

Reliability & Renewal Works

3 Yrs
Project Duration
400t
Crane — THP Hopper Relocation
Zero Harm
Safety Record
01
Engaged
GC21
Contract awarded
02
Mobilised
St Marys
On-site delivery
03
Delivered
3 Years
Total programme
04
Outcome
Zero Harm
Safety standard met
Project Summary

Reliability & Renewal Works

AJM United were one of the first major Structural, Mechanical & Piping (SMP) contractors onsite, playing a large role in the St Marys Water Recycling Plant's reliability and renewal works. The project covered multiple different processing plants, each requiring specialised installation, each serving a vital part of the overall operation.

Key Achievements

Milestones engineered into delivery.

Quantifiable wins from a programme delivered to the highest engineering, safety and environmental standards.

3 Yrs
Project Duration
400t
Crane — THP Hopper Relocation
Zero Harm
Safety Record
Specialist Water Industry
Sector-specific expertise applied end-to-end
01 — Challenge

The Challenge.

This GC21 contract required precise planning and coordination between AJM United's manufacturing shop and onsite installation teams. The company operated two parallel project management teams — one offsite, one onsite — and assigned dedicated teams to each area to ensure compliance with Sydney Water technical standards.

St Marys Water Recycling Plant — on-site delivery
On-site · St Marys
02 — Delivery

Scope of Works.

  • Supply, Engineering, Manufacturing, Coatings, Delivery of Structural Steel & Piping
  • Structural Steel, Building, Platforms, Stairs, Pipe Supports
  • SS316 Launders, Troughs, Scum Boxes, Stop Boards, Discharge & Bypass Weirs
  • Mechanical Equipment installation
  • Piping: SS316, PVC-U, PE, ABS non-metallic piping & fittings
  • Double Containment Chemical Piping (GF and Vinidex)
  • Ductile Iron rubber and concrete lined installation
  • Removal of Old Assets / New Like-for-Like installation
  • Shutdown tie-in works to existing Sydney Water systems
  • Pre and Dry Commissioning
03 — Coverage

Areas of Work.

  • Sludge Screening Area
  • Pre-dewatering Feed Averaging (FAT Tanks)
  • THP Feed Storage & THP Facility
  • Waste Gas Burners (incl. Digested Gas lines)
  • Pre-dewatering Building
  • Digester Tanks 1 & 2 — Complete Overhaul
  • Digester 1-4 Mixing Pumps
  • Heat Exchangers & associated pipework
  • Boiler Plant
  • Cogeneration Plant
  • Digester Gallery
  • Inlet Works
  • RAS Pumping Station
  • CCT Facility
  • THP Hopper Relocation (400t Crane)
  • Manual & Pneumatic Slide Gates / Penstocks
In The Field

Project Gallery.

A visual window into the water sector environments AJM United operates within.

Wastewater treatment plant works
Wastewater treatment plant works
Water recycling facility
Water recycling facility
Sewerage infrastructure upgrade
Sewerage infrastructure upgrade
On-site civil construction
On-site civil construction
Plant maintenance scope
Plant maintenance scope
04 — Outcome

Delivered. Safely. On time.

Delivered from ground up to dry commissioning with excellence. Drawing control and a dedicated detailing team using the latest software (working from BIM models and GA engineering drawings) were key success factors. Zero harm to all employees, contractors, and the environment.